Panelzap is a ServiceM8 add-on for MCS solar installers. It runs on the job: open any job in ServiceM8, then More → Panelzap. It works in the ServiceM8 Online Dashboard and on the job screen in the ServiceM8 iOS app. The Clocks dashboard and Setup are in the Online Dashboard.
Panelzap is by invitation while we help each installer set up. Request an invite and we will send you the install link. You need a ServiceM8 account: if you do not have one yet, start a free trial.
Open the install link while signed in to ServiceM8 as an admin and press Connect, then Allow. ServiceM8 asks you to allow access to jobs, queues, checklists, forms, attachments, materials and contacts: Panelzap reads and updates those on the jobs you open it on. You are brought straight back to ServiceM8.
In ServiceM8 go to Add-ons → Panelzap - Setup and press Set up this account now. It adds what is missing and reuses anything you already have:
It never touches your existing jobs, clients, quotes or invoices, and it is safe to run again: Check and repair set-up only adds what is missing.
Make a test job, drag it into 01 Enquiry Received, then open More → Panelzap. The job hub tells you what to do next.
Add-ons → Panelzap - Setup holds your business details and how strict Panelzap is. Press Save settings after changing anything.
The Your data section at the bottom explains what Panelzap stores and has the Delete my Panelzap data now button (see Your data).
Your ServiceM8 queues become the MCS process. When a job moves into a stage, Panelzap adds that stage's checklist to the job card. Tick the items on the job card in ServiceM8, or let Panelzap tick them when it sees the form or document. Before a job moves on, Panelzap checks the gate items for that stage.
| 01 Enquiry Received | Contact details and address confirmed, the technical capture (property, roof, EPC, usage), and bill, consumer unit and roof photos. |
|---|---|
| 02 Design & Proposal | Design produced, performance estimate issued in the MCS 032 format, MCS Customer Commitment issued (MCS-F01), follow-up call logged. |
| 03 Survey Booked | Survey deposit taken with refund terms in writing, deposit invoice raised, survey date in the diary. |
| 04 Surveyed - Design Locked | Site survey and structural evaluation (MCS-F02), structural calculation attached, MCS 012 mounting recorded, planning checked, Technical Supervisor design sign-off (MCS-F03), final quote issued and accepted, DNO Letter of Authority signed (MCS-F04). |
| 05 Contract & Deposit Protected | Contract signed, deposit invoiced and received, financial protection registered and the certificate issued to the customer, scaffolding quoted if needed. |
| 06 DNO Submitted | Combined export capacity worked out, G98 or G99 decided with the reasoning recorded (MCS-F05), application reference on the job. |
| 07 DNO Approved | G99 approval on file, or the G98 notification logged, plus any export limitation forms. |
| 08 Scheduled | Install date locked, RAMS and site risk assessment, materials ordered, scaffolding booked, team and subcontractors confirmed, stage payment invoiced if the contract has one. |
| 09 Installed - Commissioning | Installation and commissioning record (MCS-F06), Electrical Installation Certificate, Technical Supervisor sign-off (MCS-F07). The commissioning date starts the 30-day certificate clock. |
| 10 Notifications Due | Building Control notified, MCS certificate raised on the MID within 30 days, DNO close-out sent. |
| 11 Handover Sent - Closed | Handover pack issued (MCS-F08), balance invoiced, customer acknowledgement, job archived for six-year retention. |
| Aftercare / Complaint | Log the complaint in the register with root cause and preventative action, and share the learning. |
Opening Panelzap on a job shows the hub: the stage the job is in, how many gate items are left before it can move on, and a Do this now list with the next step at the top. Across the top are the five screens in order: Array, Design, Quote, Compliance, Handover. More has References and the extra tools. Tiles show the system, the DNO route, the quote and the MCS certificate clock at a glance.
Every screen has a How this screen works box. If the hub ever does not say what to do next, tell us: that is a bug.
Where the home is inside the MCS tables, Panelzap uses them. For homes outside the tables (for example very high use or electric heating) choose another method: upload half-hourly meter data, or use the modelled profile built from the home's use and heating type. The method and its assumptions are printed with the estimate, as MCS requires.
The Design screen is filled in from the array. Add the inverter and cables, then press Run checks. Panelzap checks strings against the inverter window, DC and AC cable rating and voltage drop, wind uplift and fixings, the roof, and works out G98 or G99 for the DNO.
The verdict stays at Check until the panel and inverter are named and you tick Checked for this address. If the wind check needs the hooks closer than the parts list has them, it tells you what to change on Array and layout. Save the design to keep a dated design record on the job.
The Quote screen prices the job from the parts list, your kit prices, labour and your target margin, with the true margin in view. You can add options (for example with and without a battery). It builds the payment schedule from your settings: survey deposit, deposit, any stage payment and the balance.
Press Write lines to the job to put the quote on the ServiceM8 job. The customer sees a few summary lines; your cost build-up goes on a private note. Once a job reaches 05 Contract & Deposit Protected the quote lines are fixed.
The Compliance screen shows every MCS form and gate item for the job and which are done. The forms are ServiceM8 forms, filled in on the job in the app or the dashboard:
Put reference numbers (DNO application, MCS certificate) under More → References.
The Handover screen lists the eleven documents the customer must get, from the MCS certificate and financial protection certificate to the as-built schematic and performance estimate, and checks them against what is attached to the job. If an attachment's name did not match, tag it from the drop-down and press Save tags. When everything is there, mark the pack ready, send it, and complete MCS-F08.
Add-ons → Panelzap - Clocks shows every job with a deadline running: the 30-day MCS certificate clock from the commissioning date on MCS-F06, and the G98 notification (28 days) or G99 commissioning confirmation. Panelzap checks the clocks every night and badges jobs that are getting close.
Panelzap never sends anything to your customers. Every email it prepares is a draft that you send yourself.
Your jobs, forms and documents stay in your ServiceM8 account. Panelzap keeps an encrypted connection to your account, your settings, and the design and quote working for each job. Read the privacy policy for the detail.
Email us with what you expected, what happened, a screenshot, and the build number from the bottom of the screen. We read every message and reply as quickly as we can.