Help

How to install, set up and use Panelzap in ServiceM8.

Getting started

Panelzap is a ServiceM8 add-on for MCS solar installers. It runs on the job: open any job in ServiceM8, then More → Panelzap. It works in the ServiceM8 Online Dashboard and on the job screen in the ServiceM8 iOS app. The Clocks dashboard and Setup are in the Online Dashboard.

1. Get your invite

Panelzap is by invitation while we help each installer set up. Request an invite and we will send you the install link. You need a ServiceM8 account: if you do not have one yet, start a free trial.

2. Install and connect

Open the install link while signed in to ServiceM8 as an admin and press Connect, then Allow. ServiceM8 asks you to allow access to jobs, queues, checklists, forms, attachments, materials and contacts: Panelzap reads and updates those on the jobs you open it on. You are brought straight back to ServiceM8.

3. Run Setup once

In ServiceM8 go to Add-ons → Panelzap - Setup and press Set up this account now. It adds what is missing and reuses anything you already have:

  • the eleven job stages as queues, plus Aftercare / Complaint
  • status badges for the dispatch board
  • the eight MCS forms (MCS-F01 to MCS-F08), if forms are switched on in your account
  • email templates, which are drafts you send yourself

It never touches your existing jobs, clients, quotes or invoices, and it is safe to run again: Check and repair set-up only adds what is missing.

4. Try it on a test job

Make a test job, drag it into 01 Enquiry Received, then open More → Panelzap. The job hub tells you what to do next.

Setup and settings

Add-ons → Panelzap - Setup holds your business details and how strict Panelzap is. Press Save settings after changing anything.

  • Your business: trading name, certification body, MCS number, financial protection provider, Technical Supervisors and default region. These are printed on design records and used for the MCS certificate fields.
  • How strict: Advise lets jobs move with outstanding items shown and badged. Enforce moves a job back if it is dragged forward with items missing. You can also turn the "Gate Failed" badge on the dispatch board on or off.
  • Pricing defaults: labour day rate, target margin and default wind speed, used by the Quote and Design screens.
  • Payments: survey deposit, deposit percentage at contract and the rest of your payment schedule, used to build the quote.

The Your data section at the bottom explains what Panelzap stores and has the Delete my Panelzap data now button (see Your data).

The eleven job stages

Your ServiceM8 queues become the MCS process. When a job moves into a stage, Panelzap adds that stage's checklist to the job card. Tick the items on the job card in ServiceM8, or let Panelzap tick them when it sees the form or document. Before a job moves on, Panelzap checks the gate items for that stage.

01 Enquiry ReceivedContact details and address confirmed, the technical capture (property, roof, EPC, usage), and bill, consumer unit and roof photos.
02 Design & ProposalDesign produced, performance estimate issued in the MCS 032 format, MCS Customer Commitment issued (MCS-F01), follow-up call logged.
03 Survey BookedSurvey deposit taken with refund terms in writing, deposit invoice raised, survey date in the diary.
04 Surveyed - Design LockedSite survey and structural evaluation (MCS-F02), structural calculation attached, MCS 012 mounting recorded, planning checked, Technical Supervisor design sign-off (MCS-F03), final quote issued and accepted, DNO Letter of Authority signed (MCS-F04).
05 Contract & Deposit ProtectedContract signed, deposit invoiced and received, financial protection registered and the certificate issued to the customer, scaffolding quoted if needed.
06 DNO SubmittedCombined export capacity worked out, G98 or G99 decided with the reasoning recorded (MCS-F05), application reference on the job.
07 DNO ApprovedG99 approval on file, or the G98 notification logged, plus any export limitation forms.
08 ScheduledInstall date locked, RAMS and site risk assessment, materials ordered, scaffolding booked, team and subcontractors confirmed, stage payment invoiced if the contract has one.
09 Installed - CommissioningInstallation and commissioning record (MCS-F06), Electrical Installation Certificate, Technical Supervisor sign-off (MCS-F07). The commissioning date starts the 30-day certificate clock.
10 Notifications DueBuilding Control notified, MCS certificate raised on the MID within 30 days, DNO close-out sent.
11 Handover Sent - ClosedHandover pack issued (MCS-F08), balance invoiced, customer acknowledgement, job archived for six-year retention.
Aftercare / ComplaintLog the complaint in the register with root cause and preventative action, and share the learning.

The job hub

Opening Panelzap on a job shows the hub: the stage the job is in, how many gate items are left before it can move on, and a Do this now list with the next step at the top. Across the top are the five screens in order: Array, Design, Quote, Compliance, Handover. More has References and the extra tools. Tiles show the system, the DNO route, the quote and the MCS certificate clock at a glance.

Every screen has a How this screen works box. If the hub ever does not say what to do next, tell us: that is a bug.

Array and layout

  1. Add each roof face: direction (azimuth) and pitch.
  2. Tap the panels onto the roof. Panelzap counts them and builds the parts list.
  3. Draw anything on the horizon onto the sunpath chart to set the shade factor.
  4. Enter the household's yearly use and whether there is a battery.
  5. Press Calculate for the MCS 032 yearly estimate, a PVGIS cross-check and the parts to order.

Self-consumption

Where the home is inside the MCS tables, Panelzap uses them. For homes outside the tables (for example very high use or electric heating) choose another method: upload half-hourly meter data, or use the modelled profile built from the home's use and heating type. The method and its assumptions are printed with the estimate, as MCS requires.

Design checks

The Design screen is filled in from the array. Add the inverter and cables, then press Run checks. Panelzap checks strings against the inverter window, DC and AC cable rating and voltage drop, wind uplift and fixings, the roof, and works out G98 or G99 for the DNO.

The verdict stays at Check until the panel and inverter are named and you tick Checked for this address. If the wind check needs the hooks closer than the parts list has them, it tells you what to change on Array and layout. Save the design to keep a dated design record on the job.

Quote

The Quote screen prices the job from the parts list, your kit prices, labour and your target margin, with the true margin in view. You can add options (for example with and without a battery). It builds the payment schedule from your settings: survey deposit, deposit, any stage payment and the balance.

Press Write lines to the job to put the quote on the ServiceM8 job. The customer sees a few summary lines; your cost build-up goes on a private note. Once a job reaches 05 Contract & Deposit Protected the quote lines are fixed.

Compliance and the MCS forms

The Compliance screen shows every MCS form and gate item for the job and which are done. The forms are ServiceM8 forms, filled in on the job in the app or the dashboard:

  • MCS-F01 Pre-Sale & Customer Commitment
  • MCS-F02 Site Survey & Structural Evaluation
  • MCS-F03 Design Sign-Off
  • MCS-F04 DNO Letter of Authority
  • MCS-F05 DNO Record
  • MCS-F06 Installation & Commissioning
  • MCS-F07 Technical Supervisor Sign-Off
  • MCS-F08 Handover Pack Issue

Put reference numbers (DNO application, MCS certificate) under More → References.

Handover pack

The Handover screen lists the eleven documents the customer must get, from the MCS certificate and financial protection certificate to the as-built schematic and performance estimate, and checks them against what is attached to the job. If an attachment's name did not match, tag it from the drop-down and press Save tags. When everything is there, mark the pack ready, send it, and complete MCS-F08.

Clocks dashboard

Add-ons → Panelzap - Clocks shows every job with a deadline running: the 30-day MCS certificate clock from the commissioning date on MCS-F06, and the G98 notification (28 days) or G99 commissioning confirmation. Panelzap checks the clocks every night and badges jobs that are getting close.

Your first job, start to finish

  1. Enquiry. Make the job and drag it into 01 Enquiry Received. Tick the three checklist items as you get the details and photos.
  2. Design. Open Panelzap and follow Do this now. Lay the panels out, run the design checks and save the design. Issue the estimate and the MCS Customer Commitment (MCS-F01). Move to 02, then 03 when the survey is booked and the survey deposit invoiced.
  3. Survey. Fill in MCS-F02 and MCS-F03, attach the structural calculation, get MCS-F04 signed. Move to 04. If the survey changed the price, change the quote and write the lines again.
  4. Contract. Contract signed, deposit invoiced and protected. Move to 05. From here the quote lines are fixed.
  5. DNO. The design says G98 or G99. Fill in MCS-F05, submit, put the reference under References. Move to 06, then 07 when approved, then 08 when the install is booked.
  6. Install. Fit, test and commission. Fill in MCS-F06 with the commissioning date: the 30-day clock starts. Move to 09.
  7. Certify. Notify the DNO or send the G99 confirmation. Raise the MCS certificate on the MID and put the number under References. Move to 10.
  8. Hand over. Attach the eleven documents, mark the pack ready, send it, complete MCS-F08. Move to 11. Done.

Panelzap never sends anything to your customers. Every email it prepares is a draft that you send yourself.

Your data, uninstalling and support

Your jobs, forms and documents stay in your ServiceM8 account. Panelzap keeps an encrypted connection to your account, your settings, and the design and quote working for each job. Read the privacy policy for the detail.

  • Delete now: Add-ons → Panelzap - Setup → Delete my Panelzap data now (press twice). Then uninstall Panelzap in ServiceM8.
  • Uninstall: remove Panelzap in ServiceM8 under Settings → Add-ons. Everything Panelzap holds for your account is deleted automatically 30 days later. Reinstall before then and it carries on where you left off.

Support

Email us with what you expected, what happened, a screenshot, and the build number from the bottom of the screen. We read every message and reply as quickly as we can.